Natural Disaster Repair Works Listings

All Works

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Construction 2022 Natural Disaster Reconstruction Works 24 April 2024
Completed 2023 Natural Disaster Reconstruction Works 24 April 2024
Closed
Flooded
Completed Abernethys Road - Budgong - Landslip Northern 12 February 2024
Open
No restrictions
Completed Abernethys Road - Budgong - Unsealed Pavement Repair Northern 01 November 2023
Open
Load limit
3 tonne
Planning Agars Lane - Berry - Pavement Repair Northern 21 March 2024
Open
No restrictions
Completed Allerton Av - Culburra Beach - Beach Access Path and Stairs 26 March 2024
Open
No restrictions
Planning Anson Street & Loralyn Avenue - Sanctuary Point - Pavement Damage Basin 12 April 2024
Open
No restrictions
Completed Bamarang Road - Bamarang - Landslip Central 19 March 2024
Open
No restrictions
Completed Barfield Road - Cambewarra - Pavement Damage Northern 04 August 2023
Open
No restrictions
Completed Beach St - Huskisson - Footpath (near Holiday Haven Huskisson Beach) Basin 05 December 2023
Open
No restrictions
Completed Beach Street - Huskisson - Footpath (near Holiday Haven White Sands) Basin 11 January 2024
Open
No restrictions
In Progress Bendalong Road - Bendalong - Pavement Repair Southern 19 April 2024
Open
Reduced speed
Completed Berrara Road - Berrara - Beach access path repair Basin 12 February 2024
Open
No restrictions
Planning Berringer Crescent - Berringer Lake - Pavement repair Southern 04 March 2024
Open
No restrictions
Planning Boorawine Tr & Sheaffe St - Callala Bay - Beach Access Path 22 April 2024
Closed
Damaged structure
Planning Braidwood Road - Shoalhaven LGA - Pavement repair Basin 19 April 2024
Open
Reduced speed
Road damage
Completed Browns Mountain Road - Browns Mountain - Landslip Northern 12 February 2024
Open
No restrictions
Planning Bryces Road - Far Meadow - Pavement Repair Northern 04 April 2024
Open
No restrictions
Construction Bundewallah Rd, Bundewallah - Bridge Replacement over Chisholms Ck 22 May 2023
Open
Reduced speed
Completed Bundewallah Road - Bundewallah - Pavement Damage Northern 08 September 2023
Open
No restrictions
Construction Bunkers Hill Road - Barrengarry - Landslip Northern 24 April 2024
Closed
Load limit
3 tonne
Residents only
Road damage
Landslip
Planning Burrier Road - Burrier - Pavement Repair Central 19 April 2024
Open
Reduced speed
Construction Burrier Road - Burrier - Various Landslips Central 24 April 2024
Closed
Reduced speed
Landslip
Traffic lights
Completed Cabbage Tree Lane - Nowra Hill - Pavement Repair Central 31 March 2023
Open
No restrictions
Completed Callala Beach Rd - Callala Beach - Pavement Repair Central 31 March 2023
Open
No restrictions
Completed Cammaray Drive - St Georges Basin - Road Closure Basin 13 October 2023
Open
No restrictions
Completed Carters Road - Barrengarry - Culvert & Landslip Repair Northern 07 December 2023
Open
Road damage
Completed Collier Drive - Cudmirrah - Beach access path repair Southern 06 February 2024
Open
No restrictions
Planning Comerong Island Rd & South St - Terara - Pavement Repair Central 11 March 2024
Open
No restrictions
In Progress Coolangatta Road - Coolangatta - Pavement Repair Northern 02 April 2024
Open
Reduced speed
Planning Cottee Close - Conjola Park - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Culburra Road - Wollumboola - Pavement Repair Central 11 March 2024
Open
No restrictions
Completed Cunjurong Point Beach Access Stairs Upgrade - Ottawa St 18 March 2024
Open
No restrictions
Planning Fishermans Paradise Road - Fishermans Paradise - Pavement Repair Southern 05 March 2024
Open
No restrictions
Construction Foremans Road - Woodhill - Landslip Northern 24 April 2024
Closed
Load limit
5 tonne
Residents only
Landslip
In Progress Gerroa Road - Coolangatta - Pavement Repair Northern 02 April 2024
Open
Road damage
Completed Greenwell Point Road - Greenwell Point - Pavement Repair Central 23 August 2023
Open
No restrictions
In Progress Havilland Street - Conjola Park - Pavement repair Southern 05 March 2024
Open
No restrictions
Completed Hawken Road - Tomerong - Pavement Damage Basin 31 January 2024
Open
No restrictions
Completed Hillandale Road - Broughton Vale - Pavement Repair Northern 06 June 2023
Open
No restrictions
Planning Hockeys Lane - Cambewarra - Sealed Pavement Repair Northern 05 April 2024
Open
Reduced speed
Planning Hockeys Lane - Tapitallee - Pavement Repair Northern 21 March 2024
Open
No restrictions
Completed Holden Street - Vincentia - Footpath Repair Basin 19 February 2024
Open
Road damage
Completed Hughes Road - Illaroo - Landslip Northern 27 March 2024
Open
No restrictions
Planning Illaroo Road - North Nowra - Pavement Repair Northern 21 March 2024
Open
Reduced speed
Planning Inyadda Drive - Manyana - Pavement repair Southern 05 March 2024
Open
No restrictions
Completed Irvines Road - Berry Mountain - Pavement Repair Northern 05 April 2024
Open
No restrictions
Planning Island Point Road - St Georges Basin - Jetty Repair Basin 12 April 2024
Closed
Damaged structure
Completed Jacks Corner Road - Kangaroo Valley - Sealed Pavement Repair Northern 22 November 2023
Open
No restrictions
Completed Jervis Bay Road - Falls Creek - Pavement Repair Basin 13 October 2023
Open
No restrictions
Completed Jindy Andy Lane - Pyree Numbaa - Pavement Repair Central 31 March 2023
Open
No restrictions
Planning Kangaroo Valley Road - Berry Mountain - Pavement Repair Northern 24 April 2024
Open
Load limit
12 tonne
One lane
Landslip
Completed Kangaroo Valley Road - Kangaroo Valley - Landslip Northern 24 April 2024
Open
Load limit
12 tonne
One lane
Landslip
Completed Kerry Street - Sanctuary Point - Pavement Damage Basin 13 September 2023
Open
No restrictions
Planning Lackersteen Street - Callala Bay - Beach Access Path 22 April 2024
Open
Damaged structure
Planning Lake Conjola Entrance Road - Yatte Yattah - Pavement Repair Southern 05 March 2024
Open
No restrictions
In Progress Lower Shoalhaven River - Flood Levee Repairs 08 March 2024
Open
Damaged structure
Planning Main Road - Cambewarra Village - Pavement Repair Northern 12 February 2024
Open
No restrictions
Completed Martinvale Lane - Jaspers Brush - Causeway Repair Northern 28 July 2023
Open
No restrictions
Planning Matron Porter Drive - Milton - Footpath Landslip Southern 05 March 2024
Open
Landslip
Planning McMahons Road - North Nowra - Pavement Damage Northern 04 April 2024
Open
No restrictions
Planning Millbank Road - Terara & Worrigee - Pavement Repair Central 11 March 2024
Open
No restrictions
Completed Mitchell Parade - Mollymook Beach - Stormwater Outlet 18 March 2024
Open
No restrictions
Planning Mount Agony Road - East Lynne - Pavement Repairs Southern 16 April 2024
Open
Reduced speed
Road damage
Completed Mount Scanzi Road - Kangaroo Valley - Landslip Northern 27 March 2024
Open
No restrictions
Construction Natural Disaster Reconstruction Works 24 April 2024
Planning North Bendalong Road - Bendalong - Beach Access Stairs 22 April 2024
Open
Damaged structure
Planning North Bendalong Road - Bendalong - Pavement repair Southern 05 March 2024
Open
No restrictions
Completed Old Burrier Fire Trail - Yalwal - Unsealed Pavement Repair Central 06 June 2023
Open
No restrictions
Planning Penguins Head Road - Culburra Beach - Beach Access Stairs 22 April 2024
Open
Damaged structure
Completed Penguins Head Road - Culburra Beach - Landslip Central 27 September 2023
Open
No restrictions
Completed Plantation Point Parade - Vincentia - Beach Access Path & Stairs 04 April 2024
Open
No restrictions
Planning Prentice Avenue - Old Erowal Bay - Pavement Repairs Basin 18 April 2024
Open
Reduced speed
Road damage
Planning Prince Edward Avenue - Culburra Beach - Beach Access Path 26 March 2024
Open
Damaged structure
Construction Roskell Road - Callala Beach - Stormwater drain repair Central 01 February 2024
Open
No restrictions
Completed Royal Mantle Drive - Ulladulla - Sinkhole & Pavement Repairs Southern 21 March 2024
Open
No restrictions
Planning Scerri Drive - Kioloa - Beach Access Path 22 April 2024
Open
Damaged structure
Completed Schofields Lane - Berry - Pavement Repair Northern 31 March 2023
Open
No restrictions
Planning Seaside Parade - Dolphin Point - Carpark pavement repair Southern 05 March 2024
Open
No restrictions
Completed Suffolk Road - Tomerong - Landslip Basin 08 February 2024
Open
No restrictions
Construction Sussex Inlet Road - Tullarwalla - Pavement Repair Southern 19 April 2024
Open
No restrictions
Completed Terara Levee Reinstatement - Southern Road - Terara Central 16 October 2023
Open
Construction Terara Road - Terara - Pavement Repair Central 12 April 2024
Open
No restrictions
Planning The Basin Road - St Georges Basin - Jetty Repair Basin 12 April 2024
Closed
Damaged structure
Completed The Wool Road - Basin View - Pavement Repair Basin 31 March 2023
Open
No restrictions
Construction Turpentine Road - Tomerong - Pavement Repair Basin 23 April 2024
Open
Reduced speed
Road damage
Completed Upper Kangaroo River Road - Upper Kangaroo River - Landslip 27 March 2024
Open
No restrictions
Planning Vigilant Street - Ulladulla - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Warrain Crescent - Currarong - Beach Access Upgrade 22 April 2024
Open
Damaged structure
Construction Wattamolla Road - Woodhill - Major and Smaller Landslips Northern 24 April 2024
Open
Residents only
Road damage
Landslip
Traffic lights
Completed Windemere Drive - Conjola Park - Pavement repair Southern 21 March 2024
Open
No restrictions
Completed Wogamia Road - Longreach - Landslip Central 03 April 2024
Open
No restrictions
Planning Woodburn Road - Morton - Pavement Repair Southern 05 March 2024
Open
Reduced speed
Completed Woodhill Mountain Road - Woodhill - Landslip & Pavement Repair Northern 27 March 2024
Open
No restrictions
Planning Woodstock Road - Morton - Pavement Repair Southern 05 March 2024
Open
Reduced speed
In Progress Yalwal Road - Mundamia - Pavement Repair Central 02 April 2024
Open
Gravel
Completed Yalwal Road - Yalwal - Landslip Central 11 March 2024
Open
No restrictions
Planning Yalwal Road - Yarramunmun Creek Bridge - Flood Repairs Central 24 April 2024
Closed
Residents only
Road damage
Damaged structure

Coastal Works

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Completed Allerton Av - Culburra Beach - Beach Access Path and Stairs 26 March 2024
Open
No restrictions
Completed Berrara Road - Berrara - Beach access path repair Basin 12 February 2024
Open
No restrictions
Planning Boorawine Tr & Sheaffe St - Callala Bay - Beach Access Path 22 April 2024
Closed
Damaged structure
Completed Collier Drive - Cudmirrah - Beach access path repair Southern 06 February 2024
Open
No restrictions
Completed Cunjurong Point Beach Access Stairs Upgrade - Ottawa St 18 March 2024
Open
No restrictions
Planning Island Point Road - St Georges Basin - Jetty Repair Basin 12 April 2024
Closed
Damaged structure
Planning Lackersteen Street - Callala Bay - Beach Access Path 22 April 2024
Open
Damaged structure
Completed Mitchell Parade - Mollymook Beach - Stormwater Outlet 18 March 2024
Open
No restrictions
Planning North Bendalong Road - Bendalong - Beach Access Stairs 22 April 2024
Open
Damaged structure
Planning Penguins Head Road - Culburra Beach - Beach Access Stairs 22 April 2024
Open
Damaged structure
Completed Plantation Point Parade - Vincentia - Beach Access Path & Stairs 04 April 2024
Open
No restrictions
Planning Prince Edward Avenue - Culburra Beach - Beach Access Path 26 March 2024
Open
Damaged structure
Planning Scerri Drive - Kioloa - Beach Access Path 22 April 2024
Open
Damaged structure
Planning The Basin Road - St Georges Basin - Jetty Repair Basin 12 April 2024
Closed
Damaged structure
Planning Warrain Crescent - Currarong - Beach Access Upgrade 22 April 2024
Open
Damaged structure

Basin District

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Planning Anson Street & Loralyn Avenue - Sanctuary Point - Pavement Damage Basin 12 April 2024
Open
No restrictions
Completed Beach St - Huskisson - Footpath (near Holiday Haven Huskisson Beach) Basin 05 December 2023
Open
No restrictions
Completed Beach Street - Huskisson - Footpath (near Holiday Haven White Sands) Basin 11 January 2024
Open
No restrictions
Planning Braidwood Road - Shoalhaven LGA - Pavement repair Basin 19 April 2024
Open
Reduced speed
Road damage
Completed Cammaray Drive - St Georges Basin - Road Closure Basin 13 October 2023
Open
No restrictions
Completed Hawken Road - Tomerong - Pavement Damage Basin 31 January 2024
Open
No restrictions
Completed Holden Street - Vincentia - Footpath Repair Basin 19 February 2024
Open
Road damage
Planning Island Point Road - St Georges Basin - Jetty Repair Basin 12 April 2024
Closed
Damaged structure
Completed Jervis Bay Road - Falls Creek - Pavement Repair Basin 13 October 2023
Open
No restrictions
Completed Kerry Street - Sanctuary Point - Pavement Damage Basin 13 September 2023
Open
No restrictions
Completed Suffolk Road - Tomerong - Landslip Basin 08 February 2024
Open
No restrictions
Planning The Basin Road - St Georges Basin - Jetty Repair Basin 12 April 2024
Closed
Damaged structure
Completed The Wool Road - Basin View - Pavement Repair Basin 31 March 2023
Open
No restrictions
Construction Turpentine Road - Tomerong - Pavement Repair Basin 23 April 2024
Open
Reduced speed
Road damage

Northern District

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Completed Abernethys Road - Budgong - Landslip Northern 12 February 2024
Open
No restrictions
Completed Abernethys Road - Budgong - Unsealed Pavement Repair Northern 01 November 2023
Open
Load limit
3 tonne
Planning Agars Lane - Berry - Pavement Repair Northern 21 March 2024
Open
No restrictions
Completed Barfield Road - Cambewarra - Pavement Damage Northern 04 August 2023
Open
No restrictions
Completed Browns Mountain Road - Browns Mountain - Landslip Northern 12 February 2024
Open
No restrictions
Planning Bryces Road - Far Meadow - Pavement Repair Northern 04 April 2024
Open
No restrictions
Construction Bundewallah Rd, Bundewallah - Bridge Replacement over Chisholms Ck 22 May 2023
Open
Reduced speed
Completed Bundewallah Road - Bundewallah - Pavement Damage Northern 08 September 2023
Open
No restrictions
Construction Bunkers Hill Road - Barrengarry - Landslip Northern 24 April 2024
Closed
Load limit
3 tonne
Residents only
Road damage
Landslip
Completed Carters Road - Barrengarry - Culvert & Landslip Repair Northern 07 December 2023
Open
Road damage
In Progress Coolangatta Road - Coolangatta - Pavement Repair Northern 02 April 2024
Open
Reduced speed
Construction Foremans Road - Woodhill - Landslip Northern 24 April 2024
Closed
Load limit
5 tonne
Residents only
Landslip
In Progress Gerroa Road - Coolangatta - Pavement Repair Northern 02 April 2024
Open
Road damage
Completed Hillandale Road - Broughton Vale - Pavement Repair Northern 06 June 2023
Open
No restrictions
Planning Hockeys Lane - Tapitallee - Pavement Repair Northern 21 March 2024
Open
No restrictions
Completed Hughes Road - Illaroo - Landslip Northern 27 March 2024
Open
No restrictions
Planning Illaroo Road - North Nowra - Pavement Repair Northern 21 March 2024
Open
Reduced speed
Completed Irvines Road - Berry Mountain - Pavement Repair Northern 05 April 2024
Open
No restrictions
Completed Jacks Corner Road - Kangaroo Valley - Sealed Pavement Repair Northern 22 November 2023
Open
No restrictions
Planning Kangaroo Valley Road - Berry Mountain - Pavement Repair Northern 24 April 2024
Open
Load limit
12 tonne
One lane
Landslip
Completed Kangaroo Valley Road - Kangaroo Valley - Landslip Northern 24 April 2024
Open
Load limit
12 tonne
One lane
Landslip
Planning Main Road - Cambewarra Village - Pavement Repair Northern 12 February 2024
Open
No restrictions
Completed Martinvale Lane - Jaspers Brush - Causeway Repair Northern 28 July 2023
Open
No restrictions
Planning McMahons Road - North Nowra - Pavement Damage Northern 04 April 2024
Open
No restrictions
Completed Mount Scanzi Road - Kangaroo Valley - Landslip Northern 27 March 2024
Open
No restrictions
Completed Schofields Lane - Berry - Pavement Repair Northern 31 March 2023
Open
No restrictions
Completed Upper Kangaroo River Road - Upper Kangaroo River - Landslip 27 March 2024
Open
No restrictions
Construction Wattamolla Road - Woodhill - Major and Smaller Landslips Northern 24 April 2024
Open
Residents only
Road damage
Landslip
Traffic lights
Completed Woodhill Mountain Road - Woodhill - Landslip & Pavement Repair Northern 27 March 2024
Open
No restrictions

Central District

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Completed Bamarang Road - Bamarang - Landslip Central 19 March 2024
Open
No restrictions
Planning Burrier Road - Burrier - Pavement Repair Central 19 April 2024
Open
Reduced speed
Construction Burrier Road - Burrier - Various Landslips Central 24 April 2024
Closed
Reduced speed
Landslip
Traffic lights
Completed Cabbage Tree Lane - Nowra Hill - Pavement Repair Central 31 March 2023
Open
No restrictions
Completed Callala Beach Rd - Callala Beach - Pavement Repair Central 31 March 2023
Open
No restrictions
Planning Comerong Island Rd & South St - Terara - Pavement Repair Central 11 March 2024
Open
No restrictions
Planning Culburra Road - Wollumboola - Pavement Repair Central 11 March 2024
Open
No restrictions
Completed Greenwell Point Road - Greenwell Point - Pavement Repair Central 23 August 2023
Open
No restrictions
Completed Jindy Andy Lane - Pyree Numbaa - Pavement Repair Central 31 March 2023
Open
No restrictions
In Progress Lower Shoalhaven River - Flood Levee Repairs 08 March 2024
Open
Damaged structure
Planning Millbank Road - Terara & Worrigee - Pavement Repair Central 11 March 2024
Open
No restrictions
Completed Old Burrier Fire Trail - Yalwal - Unsealed Pavement Repair Central 06 June 2023
Open
No restrictions
Completed Penguins Head Road - Culburra Beach - Landslip Central 27 September 2023
Open
No restrictions
Construction Roskell Road - Callala Beach - Stormwater drain repair Central 01 February 2024
Open
No restrictions
Construction Terara Road - Terara - Pavement Repair Central 12 April 2024
Open
No restrictions
Completed Wogamia Road - Longreach - Landslip Central 03 April 2024
Open
No restrictions
In Progress Yalwal Road - Mundamia - Pavement Repair Central 02 April 2024
Open
Gravel
Completed Yalwal Road - Yalwal - Landslip Central 11 March 2024
Open
No restrictions

Southern District

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
In Progress Bendalong Road - Bendalong - Pavement Repair Southern 19 April 2024
Open
Reduced speed
Planning Berringer Crescent - Berringer Lake - Pavement repair Southern 04 March 2024
Open
No restrictions
Planning Cottee Close - Conjola Park - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Fishermans Paradise Road - Fishermans Paradise - Pavement Repair Southern 05 March 2024
Open
No restrictions
In Progress Havilland Street - Conjola Park - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Inyadda Drive - Manyana - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Lake Conjola Entrance Road - Yatte Yattah - Pavement Repair Southern 05 March 2024
Open
No restrictions
Planning Matron Porter Drive - Milton - Footpath Landslip Southern 05 March 2024
Open
Landslip
Planning North Bendalong Road - Bendalong - Pavement repair Southern 05 March 2024
Open
No restrictions
Completed Royal Mantle Drive - Ulladulla - Sinkhole & Pavement Repairs Southern 21 March 2024
Open
No restrictions
Planning Seaside Parade - Dolphin Point - Carpark pavement repair Southern 05 March 2024
Open
No restrictions
Construction Sussex Inlet Road - Tullarwalla - Pavement Repair Southern 19 April 2024
Open
No restrictions
Planning Vigilant Street - Ulladulla - Pavement repair Southern 05 March 2024
Open
No restrictions
Completed Windemere Drive - Conjola Park - Pavement repair Southern 21 March 2024
Open
No restrictions
Planning Woodburn Road - Morton - Pavement Repair Southern 05 March 2024
Open
Reduced speed
Planning Woodstock Road - Morton - Pavement Repair Southern 05 March 2024
Open
Reduced speed