Kioloa Beach Access Path - Scerri Drive

The Shoalhaven was declared a Natural Disaster Area 14 September 2022 (AGRN 1034) after severe weather and flooding events. This had a major impact on Kioloa and surrounding communities, damaging infrastructure and property. As a result of damages Council is upgrading the pedestrian beach access path and stairs at Scerri Drive, Kiola.

Scerri Dr - Beach stairs 1 - Recover - 13Apr22.jpg

The latest

18/11/2024 - Works have been completed at site to improve safety and accessibility of the beach access path asset, after damage from natural disaster conditions.

This project was funded by the NSW Government under the Disaster Recovery Funding Arrangements.

About the project

In 2022 severe weather and large waves during a natural disaster event caused significant damage to this pedestrian beach access path and stairs. Erosion of the embankment at the beach access path has exposed concrete foundations of timber posts.

The recent approval for Commonwealth disaster recovery funding marks a key milestone in our efforts to rectify the damage and restore the best functionality to this access asset. Communication and progress tracking will be maintained to keep all stakeholders informed throughout the repair process.

Works will involve the replacement of a failed staircase asset, failed due to severe weather and will require the replacement asset be brought into line with current engineering standards for the coastal environment.

Image gallery

2024 Works history

4/11/2024 - Works to repair the beach access at Kiola Beach are expected to start Monday 4 November 2024. Works are anticipated to be completed within the coming weeks.

8/10/2024 - The last update is current. Updates will be provided as new information is available. 

13/8/2024 - Council has engaged with contractors on the optimal construction method to make sure repair work is carried out efficiently, with minimal disruption and ensures safety. The repair method looks to address existing damages and deliver a robust beach access path for ongoing community use.

31/7/2024 - The last update is current for this project. Further updates will be posted as new information becomes available.  Subscribe to this page for updates.

10/07/2024 - Obtaining contractor services has started. However, start date for works is delayed as the preferred contractor isn't available until next month.

21/06/2024 - Aquisition of contractor services has commenced.

14/5/2024 - The last update is still current for this project. Further updates will be posted as new information becomes available. 

22/4/2024 - Council has been in discussions with consultants recently regarding the preferred repair method.

25/3/2024 -Council recently secured funding approval to repair this beach access asset after significant damage caused by a declared natural disaster in 2022. Council is working to engage qualified contractors to carry out the necessary repair work.

 

 