Natural Disaster Repair Works Listings

All Works

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Planning Lackersteen Street - Callala Bay - Beach Access Path 16 May 2024
Open
Damaged structure
Planning Boorawine Tr & Sheaffe St - Callala Bay - Beach Access Path 16 May 2024
Closed
Damaged structure
Planning Warrain Crescent - Currarong - Beach Access Upgrade 16 May 2024
Open
Damaged structure
Planning Penguins Head Road - Culburra Beach - Beach Access Stairs 16 May 2024
Open
Damaged structure
Planning Prince Edward Avenue - Culburra Beach - Beach Access Path 16 May 2024
Open
Damaged structure
Construction Natural Disaster Reconstruction Works 29 May 2024
Construction Bundewallah Rd, Bundewallah - Bridge Replacement over Chisholms Ck 22 May 2023
Open
Reduced speed
Completed Allerton Av - Culburra Beach - Beach Access Path and Stairs 26 March 2024
Open
No restrictions
In Progress Lower Shoalhaven River - Flood Levee Repairs 23 May 2024
Open
Damaged structure
Completed Mitchell Parade - Mollymook Beach - Stormwater Outlet 18 March 2024
Open
No restrictions
Completed Plantation Point Parade - Vincentia - Beach Access Path & Stairs 04 April 2024
Open
No restrictions
Planning Scerri Drive - Kioloa - Beach Access Path 16 May 2024
Open
Damaged structure
Completed Cunjurong Point Beach Access Stairs Upgrade - Ottawa St 18 March 2024
Open
No restrictions
Planning North Bendalong Road - Bendalong - Beach Access Stairs 16 May 2024
Open
Damaged structure
Planning North Bendalong Road - Bendalong - Pavement repair Southern 05 March 2024
Open
No restrictions
Completed Windemere Drive - Conjola Park - Pavement repair Southern 21 March 2024
Open
No restrictions
Completed Yalwal Road - Yalwal - Landslip Central 11 March 2024
Open
No restrictions
Completed Holden Street - Vincentia - Footpath Repair Basin 19 February 2024
Open
Road damage
Completed Kangaroo Valley Road - Kangaroo Valley - Landslip Northern 22 May 2024
Open
Load limit
12 tonne
One lane
Landslip
Planning McMahons Road - North Nowra - Pavement Damage Northern 06 May 2024
Open
No restrictions
Construction Terara Road - Terara - Pavement Repair Central 13 May 2024
Open
No restrictions
Planning Comerong Island Rd & South St - Terara - Pavement Repair Central 09 May 2024
Open
No restrictions
Completed Woodhill Mountain Road - Woodhill - Landslip & Pavement Repair Northern 27 March 2024
Open
No restrictions
Planning Matron Porter Drive - Milton - Footpath Landslip Southern 05 March 2024
Open
Landslip
Completed Yalwal Road - Yarramunmun Creek Bridge - Flood Repairs Central 29 May 2024
Open
No restrictions
In Progress Yalwal Road - Mundamia - Pavement Repair Central 15 May 2024
Open
Gravel
Completed Collier Drive - Cudmirrah - Beach access path repair Southern 06 February 2024
Open
No restrictions
Completed Mount Scanzi Road - Kangaroo Valley - Landslip Northern 27 March 2024
Open
No restrictions
Planning Culburra Road - Wollumboola - Pavement Repair Central 09 May 2024
Open
No restrictions
Completed Browns Mountain Road - Browns Mountain - Landslip Northern 12 February 2024
Open
No restrictions
Planning Queen Street - Berry - Pavement Repair Northern 28 May 2024
Open
Road damage
Completed Prentice Avenue - Old Erowal Bay - Pavement Repairs Basin 21 May 2024
Open
No restrictions
Completed Royal Mantle Drive - Ulladulla - Sinkhole & Pavement Repairs Southern 21 March 2024
Open
No restrictions
Completed Berrara Road - Berrara - Beach access path repair Basin 12 February 2024
Open
No restrictions
Completed Terara Levee Reinstatement - Southern Road - Terara Central 16 October 2023
Open
Completed Burrier Road - Burrier - Various Landslips Central 29 May 2024
Open
Traffic lights
Planning Hockeys Lane - Tapitallee - Pavement Repair Northern 06 May 2024
Open
No restrictions
Completed Jindy Andy Lane - Pyree Numbaa - Pavement Repair Central 31 March 2023
Open
No restrictions
Completed Carters Road - Barrengarry - Culvert & Landslip Repair Northern 07 December 2023
Open
Road damage
Completed Hillandale Road - Broughton Vale - Pavement Repair Northern 06 June 2023
Open
No restrictions
Construction Turpentine Road - Tomerong - Pavement Repair Basin 13 May 2024
Open
Reduced speed
Road damage
Completed Abernethys Road - Budgong - Landslip Northern 12 February 2024
Open
No restrictions
Completed Bundewallah Road - Bundewallah - Pavement Damage Northern 08 September 2023
Open
No restrictions
Completed Martinvale Lane - Jaspers Brush - Causeway Repair Northern 28 July 2023
Open
No restrictions
Completed Barfield Road - Cambewarra - Pavement Damage Northern 04 August 2023
Open
No restrictions
In Progress Havilland Street - Conjola Park - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Lake Conjola Entrance Road - Yatte Yattah - Pavement Repair Southern 09 May 2024
Open
No restrictions
Planning Island Point Road - St Georges Basin - Jetty Repair Basin 09 May 2024
Closed
Damaged structure
Planning Agars Lane - Berry - Pavement Repair Northern 06 May 2024
Open
No restrictions
Construction Roskell Road - Callala Beach - Stormwater drain repair Central 23 May 2024
Closed
Damaged structure
Construction Foremans Road - Woodhill - Landslip Northern 29 May 2024
Open
No restrictions
Construction Bunkers Hill Road - Barrengarry - Landslip Northern 29 May 2024
Closed
Load limit
3 tonne
Residents only
Road damage
Landslip
Planning Inyadda Drive - Manyana - Pavement repair Southern 27 May 2024
Open
No restrictions
In Progress Seaside Parade - Dolphin Point - Carpark pavement repair Southern 13 May 2024
Open
No restrictions
In Progress Gerroa Road - Coolangatta - Pavement Repair Northern 14 May 2024
Open
Road damage
Planning Hockeys Lane - Cambewarra - Sealed Pavement Repair Northern 23 May 2024
Open
Reduced speed
Completed Hughes Road - Illaroo - Landslip Northern 27 March 2024
Open
No restrictions
Planning Cottee Close - Conjola Park - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Illaroo Road - North Nowra - Pavement Repair Northern 06 May 2024
Open
Reduced speed
Planning Main Road - Cambewarra Village - Pavement Repair Northern 12 February 2024
Open
No restrictions
Completed Cabbage Tree Lane - Nowra Hill - Pavement Repair Central 31 March 2023
Open
No restrictions
Completed Penguins Head Road - Culburra Beach - Landslip Central 27 September 2023
Open
No restrictions
Planning Vigilant Street - Ulladulla - Pavement repair Southern 13 May 2024
Open
No restrictions
In Progress Coolangatta Road - Coolangatta - Pavement Repair Northern 15 May 2024
Open
Reduced speed
Completed The Wool Road - Basin View - Pavement Repair Basin 31 March 2023
Open
No restrictions
Completed Abernethys Road - Budgong - Unsealed Pavement Repair Northern 01 November 2023
Open
Load limit
3 tonne
Planning Burrier Road - Burrier - Pavement Repair Central 16 May 2024
Open
Reduced speed
Planning Mount Agony Road - East Lynne - Pavement Repairs Southern 16 April 2024
Open
Reduced speed
Road damage
Planning Kangaroo Valley Road - Berry Mountain - Pavement Repair Northern 10 May 2024
Open
Load limit
12 tonne
One lane
Landslip
Completed Old Burrier Fire Trail - Yalwal - Unsealed Pavement Repair Central 06 June 2023
Open
No restrictions
Completed Greenwell Point Road - Greenwell Point - Pavement Repair Central 23 August 2023
Open
No restrictions
Planning Millbank Road - Terara & Worrigee - Pavement Repair Central 09 May 2024
Open
No restrictions
Construction Wattamolla Road - Woodhill - Major and Smaller Landslips Northern 29 May 2024
Open
Residents only
Traffic lights
Planning Anson Street & Loralyn Avenue - Sanctuary Point - Pavement Damage Basin 09 May 2024
Open
No restrictions
Completed Bamarang Road - Bamarang - Landslip Central 19 March 2024
Open
No restrictions
Completed Upper Kangaroo River Road - Upper Kangaroo River - Landslip 27 March 2024
Open
No restrictions
Completed Callala Beach Rd - Callala Beach - Pavement Repair Central 31 March 2023
Open
No restrictions
Planning Bryces Road - Far Meadow - Pavement Repair Northern 17 May 2024
Open
No restrictions
Completed Wogamia Road - Longreach - Landslip Central 03 April 2024
Open
No restrictions
Completed Schofields Lane - Berry - Pavement Repair Northern 31 March 2023
Open
No restrictions
Completed Irvines Road - Berry Mountain - Pavement Repair Northern 05 April 2024
Open
No restrictions
Completed Jacks Corner Road - Kangaroo Valley - Sealed Pavement Repair Northern 22 November 2023
Open
No restrictions
Planning The Basin Road - St Georges Basin - Jetty Repair Basin 09 May 2024
Closed
Damaged structure
Planning Braidwood Road - Shoalhaven LGA - Pavement repair Basin 16 May 2024
Open
Reduced speed
Road damage
Construction 2022 Natural Disaster Reconstruction Works 29 May 2024
Completed 2023 Natural Disaster Reconstruction Works 08 May 2024
Closed
Flooded
Planning Fishermans Paradise Road - Fishermans Paradise - Pavement Repair Southern 03 June 2024
Open
No restrictions
In Progress Bendalong Road - Bendalong - Pavement Repair Southern 03 June 2024
Open
Reduced speed
Road damage
Planning Woodstock Road - Morton - Pavement Repair Southern 03 June 2024
Open
Reduced speed
Construction Sussex Inlet Road - Tullarwalla - Pavement Repair Southern 03 June 2024
Open
No restrictions
Planning Woodburn Road - Morton - Pavement Repair Southern 03 June 2024
Open
Reduced speed

Coastal Works

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Planning Lackersteen Street - Callala Bay - Beach Access Path 16 May 2024
Open
Damaged structure
Planning Boorawine Tr & Sheaffe St - Callala Bay - Beach Access Path 16 May 2024
Closed
Damaged structure
Planning Warrain Crescent - Currarong - Beach Access Upgrade 16 May 2024
Open
Damaged structure
Planning Penguins Head Road - Culburra Beach - Beach Access Stairs 16 May 2024
Open
Damaged structure
Planning Prince Edward Avenue - Culburra Beach - Beach Access Path 16 May 2024
Open
Damaged structure
Completed Allerton Av - Culburra Beach - Beach Access Path and Stairs 26 March 2024
Open
No restrictions
Completed Mitchell Parade - Mollymook Beach - Stormwater Outlet 18 March 2024
Open
No restrictions
Completed Plantation Point Parade - Vincentia - Beach Access Path & Stairs 04 April 2024
Open
No restrictions
Planning Scerri Drive - Kioloa - Beach Access Path 16 May 2024
Open
Damaged structure
Completed Cunjurong Point Beach Access Stairs Upgrade - Ottawa St 18 March 2024
Open
No restrictions
Planning North Bendalong Road - Bendalong - Beach Access Stairs 16 May 2024
Open
Damaged structure
Completed Collier Drive - Cudmirrah - Beach access path repair Southern 06 February 2024
Open
No restrictions
Completed Berrara Road - Berrara - Beach access path repair Basin 12 February 2024
Open
No restrictions
Planning Island Point Road - St Georges Basin - Jetty Repair Basin 09 May 2024
Closed
Damaged structure
Planning The Basin Road - St Georges Basin - Jetty Repair Basin 09 May 2024
Closed
Damaged structure

Basin District

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Completed Holden Street - Vincentia - Footpath Repair Basin 19 February 2024
Open
Road damage
Construction Turpentine Road - Tomerong - Pavement Repair Basin 13 May 2024
Open
Reduced speed
Road damage
Planning Island Point Road - St Georges Basin - Jetty Repair Basin 09 May 2024
Closed
Damaged structure
Completed The Wool Road - Basin View - Pavement Repair Basin 31 March 2023
Open
No restrictions
Planning Anson Street & Loralyn Avenue - Sanctuary Point - Pavement Damage Basin 09 May 2024
Open
No restrictions
Planning The Basin Road - St Georges Basin - Jetty Repair Basin 09 May 2024
Closed
Damaged structure
Planning Braidwood Road - Shoalhaven LGA - Pavement repair Basin 16 May 2024
Open
Reduced speed
Road damage

Northern District

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Construction Bundewallah Rd, Bundewallah - Bridge Replacement over Chisholms Ck 22 May 2023
Open
Reduced speed
Completed Kangaroo Valley Road - Kangaroo Valley - Landslip Northern 22 May 2024
Open
Load limit
12 tonne
One lane
Landslip
Planning McMahons Road - North Nowra - Pavement Damage Northern 06 May 2024
Open
No restrictions
Completed Woodhill Mountain Road - Woodhill - Landslip & Pavement Repair Northern 27 March 2024
Open
No restrictions
Completed Mount Scanzi Road - Kangaroo Valley - Landslip Northern 27 March 2024
Open
No restrictions
Completed Browns Mountain Road - Browns Mountain - Landslip Northern 12 February 2024
Open
No restrictions
Planning Queen Street - Berry - Pavement Repair Northern 28 May 2024
Open
Road damage
Planning Hockeys Lane - Tapitallee - Pavement Repair Northern 06 May 2024
Open
No restrictions
Completed Carters Road - Barrengarry - Culvert & Landslip Repair Northern 07 December 2023
Open
Road damage
Completed Hillandale Road - Broughton Vale - Pavement Repair Northern 06 June 2023
Open
No restrictions
Completed Abernethys Road - Budgong - Landslip Northern 12 February 2024
Open
No restrictions
Completed Bundewallah Road - Bundewallah - Pavement Damage Northern 08 September 2023
Open
No restrictions
Completed Martinvale Lane - Jaspers Brush - Causeway Repair Northern 28 July 2023
Open
No restrictions
Completed Barfield Road - Cambewarra - Pavement Damage Northern 04 August 2023
Open
No restrictions
Planning Agars Lane - Berry - Pavement Repair Northern 06 May 2024
Open
No restrictions
Construction Foremans Road - Woodhill - Landslip Northern 29 May 2024
Open
No restrictions
Construction Bunkers Hill Road - Barrengarry - Landslip Northern 29 May 2024
Closed
Load limit
3 tonne
Residents only
Road damage
Landslip
In Progress Gerroa Road - Coolangatta - Pavement Repair Northern 14 May 2024
Open
Road damage
Completed Hughes Road - Illaroo - Landslip Northern 27 March 2024
Open
No restrictions
Planning Illaroo Road - North Nowra - Pavement Repair Northern 06 May 2024
Open
Reduced speed
Planning Main Road - Cambewarra Village - Pavement Repair Northern 12 February 2024
Open
No restrictions
In Progress Coolangatta Road - Coolangatta - Pavement Repair Northern 15 May 2024
Open
Reduced speed
Completed Abernethys Road - Budgong - Unsealed Pavement Repair Northern 01 November 2023
Open
Load limit
3 tonne
Planning Kangaroo Valley Road - Berry Mountain - Pavement Repair Northern 10 May 2024
Open
Load limit
12 tonne
One lane
Landslip
Construction Wattamolla Road - Woodhill - Major and Smaller Landslips Northern 29 May 2024
Open
Residents only
Traffic lights
Completed Upper Kangaroo River Road - Upper Kangaroo River - Landslip 27 March 2024
Open
No restrictions
Planning Bryces Road - Far Meadow - Pavement Repair Northern 17 May 2024
Open
No restrictions
Completed Schofields Lane - Berry - Pavement Repair Northern 31 March 2023
Open
No restrictions
Completed Irvines Road - Berry Mountain - Pavement Repair Northern 05 April 2024
Open
No restrictions
Completed Jacks Corner Road - Kangaroo Valley - Sealed Pavement Repair Northern 22 November 2023
Open
No restrictions

Central District

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
In Progress Lower Shoalhaven River - Flood Levee Repairs 23 May 2024
Open
Damaged structure
Completed Yalwal Road - Yalwal - Landslip Central 11 March 2024
Open
No restrictions
Construction Terara Road - Terara - Pavement Repair Central 13 May 2024
Open
No restrictions
Planning Comerong Island Rd & South St - Terara - Pavement Repair Central 09 May 2024
Open
No restrictions
In Progress Yalwal Road - Mundamia - Pavement Repair Central 15 May 2024
Open
Gravel
Planning Culburra Road - Wollumboola - Pavement Repair Central 09 May 2024
Open
No restrictions
Completed Burrier Road - Burrier - Various Landslips Central 29 May 2024
Open
Traffic lights
Completed Jindy Andy Lane - Pyree Numbaa - Pavement Repair Central 31 March 2023
Open
No restrictions
Construction Roskell Road - Callala Beach - Stormwater drain repair Central 23 May 2024
Closed
Damaged structure
Completed Cabbage Tree Lane - Nowra Hill - Pavement Repair Central 31 March 2023
Open
No restrictions
Completed Penguins Head Road - Culburra Beach - Landslip Central 27 September 2023
Open
No restrictions
Planning Burrier Road - Burrier - Pavement Repair Central 16 May 2024
Open
Reduced speed
Completed Old Burrier Fire Trail - Yalwal - Unsealed Pavement Repair Central 06 June 2023
Open
No restrictions
Completed Greenwell Point Road - Greenwell Point - Pavement Repair Central 23 August 2023
Open
No restrictions
Planning Millbank Road - Terara & Worrigee - Pavement Repair Central 09 May 2024
Open
No restrictions
Completed Bamarang Road - Bamarang - Landslip Central 19 March 2024
Open
No restrictions
Completed Callala Beach Rd - Callala Beach - Pavement Repair Central 31 March 2023
Open
No restrictions
Completed Wogamia Road - Longreach - Landslip Central 03 April 2024
Open
No restrictions

Southern District

Status Project name District Last reviewed Road status Restrictions and/or
reason for closure
Planning North Bendalong Road - Bendalong - Pavement repair Southern 05 March 2024
Open
No restrictions
Completed Windemere Drive - Conjola Park - Pavement repair Southern 21 March 2024
Open
No restrictions
Planning Matron Porter Drive - Milton - Footpath Landslip Southern 05 March 2024
Open
Landslip
Completed Royal Mantle Drive - Ulladulla - Sinkhole & Pavement Repairs Southern 21 March 2024
Open
No restrictions
In Progress Havilland Street - Conjola Park - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Lake Conjola Entrance Road - Yatte Yattah - Pavement Repair Southern 09 May 2024
Open
No restrictions
Planning Inyadda Drive - Manyana - Pavement repair Southern 27 May 2024
Open
No restrictions
In Progress Seaside Parade - Dolphin Point - Carpark pavement repair Southern 13 May 2024
Open
No restrictions
Planning Cottee Close - Conjola Park - Pavement repair Southern 05 March 2024
Open
No restrictions
Planning Vigilant Street - Ulladulla - Pavement repair Southern 13 May 2024
Open
No restrictions
Planning Fishermans Paradise Road - Fishermans Paradise - Pavement Repair Southern 03 June 2024
Open
No restrictions
In Progress Bendalong Road - Bendalong - Pavement Repair Southern 03 June 2024
Open
Reduced speed
Road damage
Planning Woodstock Road - Morton - Pavement Repair Southern 03 June 2024
Open
Reduced speed
Construction Sussex Inlet Road - Tullarwalla - Pavement Repair Southern 03 June 2024
Open
No restrictions
Planning Woodburn Road - Morton - Pavement Repair Southern 03 June 2024
Open
Reduced speed