Abernethys Road - Budgong - Unsealed Pavement Repair

Abernethys Road was severely impacted in March by an East Coast Low and subsequent rain events.

The latest

01/11/2023 - Gravel resheeting works on Abernethys Road have now been completed.

About the works

2023 Works History

Abernethys completed road.JPG

08/09/2023 - Following the repair of the landslip on Abernethys Road, gravel resheeting works will begin to take place. It is expected these works will commence mid October 2023.

20/04/2023 - Works for the construction of the new stormwater drainage crossing along Abernethys Road have been completed. Spot gravel resheeting works up to the landslip have also now been completed. Further gravel resheeting works will follow the completion of the landslip works later in the year.

30/3/2023 - Construction of the culvert drainage improvements have been completed by Lynch Civil. Spot gravel re-sheet is on track to commence 17 April 2023.

30/03/2023 - Works have commenced for the construction of the new stormwater drainage crossings along Abernethys Road. The works involve the installation of new stormwater culverts at 3 locations. Spot gravel re sheeting works commence 17/4/23 weather permitting for 4 days. Stop slow traffic control will be in place for these works. Minor delays may occur.

23/03/2023 - Works have commenced for the construction of the new stormwater drainage crossings along Abernethys Road. The works involve the installation of new stormwater culverts at 3 locations. Spot gravel resheeting works will follow.

02/03/2023 - Works have commenced for the construction of the new stormwater drainage crossings along Abernethys Road. The works involve the installation of new stormwater culverts at 3 locations. 

Gravel resheeting works will be undertaken following the construction of the stormwater drainage work

23/02/2023 - Works on Abernathys Lane are ongoing. Culvert at middle site has been placed and the top and bottom sites have been prepared for excavation and installation of culvert crossings.

abernethy.JPG            Abernathys Lane 2.jpg

02/02/2023 - Council will be undertaking the construction of the new stormwater drainage crossings along Abernethy’s Road. The works will involve demolition of existing materials and the placement of new adequate drainage and pavement materials. Works are expected to commence early/mid February. 

Gravel resheeting works will be undertaken following the construction of the stormwater drainage work.

23/1/23 - Drainage Culvert construction start date - 24th January 2023

10/1/23 - Council will be undertaking the construction of the new stormwater drainage crossings along Abernethy’s Road. The works will involve demolition of existing materials and the placement of new adequate drainage and pavement materials.

We invite you to attend a site meeting with Contractor & Council - 2pm Monday 16 January 2023 at the stockpile location where culverts are currently stored.

 

2022 Works History

21/12/2022 - Works are expected to commence in March 2023 following completion of culvert works.

12/12/2022 - A contractor has been engaged to carry out repair works to the unsealed road pavement and repair the table drains prior to the landslip located at CH1900. Works are expected to commence in March 2023 following completion of culvert works.

Abernethys Road was severely impacted by the March East Coast Low and subsequent rain events.

Abernethys post event.JPG

 

 

 