Kangaroo Valley Road - Kangaroo Valley - Landslip

Kangaroo Valley Road was impacted by damages following the declared natural disaster 7 April 2024 severe weather event. Two new landslips required the road closed for a period.

The Shoalhaven was declared a Natural Disaster Area 5 March 2022 after an East Coast Low and rain events. This had a major impact on Kangaroo Valley and surrounding communities, landslips affecting roads and property.

The latest

Kangaroo Valley Rd is open and under traffic control, with one lane open to motorists. Motorists are advised to allow an extra 5-10 minutes when travelling.

Two (2) major landslips and related repair works were completed March 2024.
See Related Documents for updated 3-week Lookahead Program 23 April 2024.

Select image below for a closer look at Site 2 major landslip repair work.

About the works

Kangaroo Valley Road reopened

Kangaroo Valley Road is now open and under traffic control, with one lane open to motorists following declared natural disaster 7 April 2024 (AGRN 1119) severe weather and flooding event.  

The road was closed 4pm Saturday 6 April 2024 after severe rainfall threatened the stability of a section of the road. The impacted area is approximately 700 metres from the intersection of Ben Dooley Road toward Berry and showing significant cracking and signs of failure. Following a geotechnical investigation, Council has been advised to open one lane while further assessments are continuing. Motorists using Kangaroo Valley Road are advised to allow an extra 5 – 10 minutes when travelling.

Subscribe to this page for access and repair work updates.

Landslip repair sites

Site 1. DM00806 - rural address 1260 - major landslip repair works are completed. 

Site 2. DM00805 - rural address 1167 - major landslip repair works are completed. 

Below: Site 1 works yet to start Site 2 landslip and road repair works near completion 13 March 2024. 

KANGAROO VALLEY RD DM00806 site 1 - Adam - 13 Mar24.jpg KNAGAROO VALLEY RD DM00805 site 2 - Adam - 13Mar24.jpg

Below: Major landslip and road repair works in progress on Kangaroo Valley Road

Kangaroo Valley Rd - landslip works - Adam - 22Nov23.jpg

2024 Works history

18/4/2024 - Announcement: Kangaroo Valley Road is now open and under traffic control, with one lane open to motorists. The road was closed 4pm Saturday 6 April after severe rainfall threatened the stability of a section of road as well as 2 new landslip damages. Motorists using Kangaroo Valley Road are advised to allow an extra 5 – 10 minutes when travelling. 12-tonne load limit. Find more details under - About the works.

12/3/2024 - Announcement: Contraflow traffic conditions ongoing. All remaining landslip repair works are planned to be completed under contraflow traffic conditions. Guardrail (crash barrier) installation is planned for March 2024. Find details under - About the works. Subscribe to this page for updates.

27/2/2024 - Announcement: Rescheduled completion of landslip repair works at Site 2 is Monday 26 February 2024, weather permitting. The latest: Contractor Symal released revised construction program. Find the updated three-week Lookahead Program 27 February 2024 under Related Documents. Repair works and road closures at each site are also detailed under 'About the works'. 

20/2/2024 - Announcement: Planned completion of works at Site 2 is 16 February 2024, weather permitting. Intermittent full road closures at Site 2 near rural address 1167 between 9am and 1.30pm 15 February and 16 February 2024. Expect 30min delays. Otherwise, single lane contraflow traffic conditions. No pedestrian access.

2/1/7/2024 to 23/2/2024 – Updated three-week Lookahead program released each week by contractor, Symal, and published weekly on this page under ‘Related Documents’. Repair works and road closures detailed weekly for all sites under ‘About the works’. 

 

2023 Works History

Below: Major landslip repairs in progress on Kangaroo Valley Road.

kangaroo Valley Rd - landslip works 1 - Adam - 22Nov23.jpg

  • 09/08/2023 to 22/12/2023 – The updated three-week Lookahead program released each week by contractor, Symal, and published weekly on this page, under ‘Related Information’. Repair works progress and road closures were also detailed weekly for all sites under ‘About the works’.

  • 08/08/2023 - Site 1. DM00806 Works start Sunday 15 October through to Friday 20 October 2023. Site 2. DM00805 Works start Wednesday 11 October through to Friday 8 December 2023.

  • 26/06/2023 - The latest update for this project is current. Further updates will be provided as new information becomes available.

  • 30/03/2023 - Landslip design plan for Kangaroo Valley Road is attached. Located under - Related Information.

  • Landslip repair drop-in sessions:
    THURS 30 March 4 – 5pm
    THURS 13 April 4 – 5pm
    Drop by the Kangaroo Valley Hall (177 Moss Vale Rd) where Symal and Council will answer your questions about upcoming roadworks.

  • 17/03/2023 - Kangaroo Valley Information Session on Friday 17 March, 7pm - 8pm (followed by BBQ) at KV Community Hall. Meet contractor Symal and get briefing on the start of landslip works.

  • 04/03/2023 - The latest construction program proposed by contractor Symal for the 38 the Major Landslip repair work has been released. The construction program lists the planned start and finish date for each of the 38 land slips. A summary of the construction program is available on the  Major Landslip Package Planned Program of Work. A copy of the construction program is also available on the right-hand side of the Master Project Page in the related documents section.

  • 15/2/2023 - Contract awarded - Council has resolved to proceed with the appointment of infrastructure and construction group Symal to repair the 38 major landslips. Council has provided Symal a schedule of works which prioritises the most urgent landslips with the first round of works to begin in late March 2023. To view the list of major landslips and the assigned construction priorities, refer to the Major landslip package priorities on the Master Project Page

2022 Works History

  • 22/12/2022 - Four tenders for the repair of 38 landslips were received. A comprehensive evaluation process has been completed and a recommendation has been forwarded to Public Work Advisory (PWA) for endorsement. It is anticipated that PWA will evaluate the tender acceptance report and respond to Council mid-January. Further information can be found on the  Master Project Page
  • 03/11/2022 - Following months of geotechnical investigations, design work and tender preparation, Council is now seeking contractors to bid on the 38 landslips deemed a priority. Submissions close 6 December 2022.Shoalhaven Area – Remediation of Multiple Slips – RFT – 10053781
  • 13/09/2022 - Following record rain events, Council has recorded 98 landslides as a high priority, with a focus on 38 sites that are deemed most urgent. We've now finished geotechnical investigations at these 38 sites, leading the way for designs to be completed in the coming weeks. The designs form part of a works package that will go out to tender in October. Load limit on this road is 12Tonne
  • 11/09/2022 - Geotechnical engineers will be conducting a site investigation on Kangaroo Valley Road, from Tuesday 13th September 2022. Borehole drilling will be conducted to inform the design.
  • 02/09/2022 - Across the Shoalhaven, of the 98 landslides that were of highest priority, a consolidated scope of 35 will form a tender package that will be going out to market prior to Christmas. Included within that tender package is, amongst others, Woodhill Mountain, Wattamolla, and Bunkers Hill Road. The start date of contract work is likely in the new year, in the interim, regular surveillance continues.
  • 27/07/2022 - Geotechnical investigations for Kangaroo Valley Road are currently re investigated due to the change in landslip structure that developed from the recent weather event this month. The investigation will include the scope to identify additional landslides.
  • 07/07/2022 - Kangaroo Valley Road has been cleared from trees and debris. The road is now open with warning signs to advise of the reduced speed limits.
  • 04/07/2022 - Kangaroo Valley Road is closed due to fallen tree's over the road and landslips.
  • 30/06/2022 - Motorists are advised to proceed with caution over the next several days as a result of the current weather forecast.
  • 23/06/2022 - Geotechnical services finalising recommendation.
  • 16/06/2022 - Road remains open while Geotechnical investigation works continue.

  • 09/06/2022 - Works currently on track with Geotechnical investigation in progress.
  • 02/06/2022 - Road remains open while investigation works continue.  
  • 26/05/2022 - Geotechnical investigations are underway.

Below: March 2022 major landslip damage on Kangaroo Valley Road. 

kangaroo valley rd 2.JPG