Estuary Name: |
LAKE TABOURIE |
|
Status of plan: |
Adopted (March 1997) and currently under comprehensive review |
|
Actions undertaken: |
|
|
Nature Conservation |
Foreshore rehabilitation plans developed and submitted in 2003-2004 Estuary Program Submission $25,000 Weed management project completed in 2008 on the southern side of the lake and funded by Southern Rivers CMA Short St car park relocated in 2003 along with foreshore rehabilitation and path installation $20,000 Education signage project funded under the DECC Estuary Program developed and installed during 2007 $30,000 Foreshore rehabilitation project funded under the DECC Estuary Program currently being developed for the northern shoreline and will be installed during 2008-2009 including education signage , fishing platform, picnic facilities and riparian revegetation. |
|
Water Quality |
Sewerage system installed during 2007-2008 which significantly addresses the major threat to water quality Stormwater management plan completed in 2005. Included sub-catchment mapping of the urban area and identification of many small catchments with low capture potential for devices. Education initiatives commenced in 2006 with brochure distribution, increased drain stencils and strengthened riparian plantings. |
|
Erosion and Sedimentation |
Foreshore erosion study completed in 2003 for area fronting Ocean St. Implementation proposed 2003 following review of consultants report, detailed design, preparation of REF and approval of Development Application under SEPP 71 conditions. Construction completed in 2006 providing erosion protection to foreshore reserve. The sand nourished areas have settled with salt marsh recolonising the new bed levels |
|
Cultural Heritage |
|
|
Flooding |
Flood Study Consultant engaged in 2007 and draft report expected late in 2008 |
|
Fishery |
Fishing Haven status 2002 Fishing platform installed in 2007 funded under the Recreation Fishing Grant program |
|
Recreation, Waterway Access & Boating |
Southern shore foreshore walking track from Oak Ave to beach including track, boardwalk, beach access viewing decks had minor upgrades in 2007-2008 along with park enhancements such as the electric BBQ |
|
Visual Quality |
Very nice |
|
Estuary Entrance |
Entrance Management Policy Completed 2006. Last intervention in winter 2007 in conjunction with a Phd student survey undertaken by UoQ |
|
|
|
|
Natural Resources and Floodplain Management Committee: |
Yes Far South NRFP committee includes Burrill and Tabourie |
|
meetings held: |
Biannually with additional meetings on a as needs basis. |


Photograph: Revegetation and Fishing platform on the southern shores of
Lake Tabourie
Surface Water Quality Lake Tabourie