Estuary Name: |
SWAN LAKE & BERRARA CREEK |
|
Status of plan: |
Plan developed and adopted by Task Force in 2002 |
|
Actions undertaken: |
|
|
-Nature Conservation |
NPWS increasing protection of shorebird nesting site at mouth of Berrara Creek Foreshore Rehabilitation projects at Dyballs Reserve Swan Haven, Errol Bond and Ski Beach Reserves completed 2006 Lake Education Signage designed and in installed in 2006 at Errol Bond Reserve Bush care group is active in restoring riparian vegetation on Berrara Creek Flats reserve Envirofund and CMA funding has been allocated in 2007 for extensive weed management work on the public reserves at the lake inlet channel area |
|
-Water Quality |
|
|
-Erosion and Sedimentation |
Foreshore rehabilitation plans have been developed under the Estuary Management Program. Implementation of these plans will continue on a priority basis as funding allows. |
|
-Cultural Heritage |
The aboriginal burial site at Errol Bond reserve uncovered by erosion triggered by elevated lake levels during 2006 have been scheduled for increased protection. These works have been approved and part funded by DECC and endorsed by the Jerringa Aboriginal Land Council. |
|
-Flooding |
The Entrance Management Policy provides alleviation of minor flooding by the mechanical opening of the lake. |
|
-Fishery |
Caulerpa signage has been installed at boat ramp locations to reduce the risk of introducing the marine pest into the lake. The naturally low salinity levels in the lake is considered to reduce the likelihood that Caulerpa would successfully establish in the lake. DPI Fisheries routinely inspect the lake for outbreaks. |
|
-Recreation, Waterway Access & Boating |
Draft Boat users Plan of Management completed in 2005 and signage installed at boat ramps Safe swimming areas have been installed at Errol Bond reserve, Cudmirrah and Dyball Reserve , Swan Haven. |
|
-Visual Quality |
Very good |
|
-Estuary Entrance |
Entrance Management Policy was adopted in 2003 under Estuary Forward Program recommending the raising of the opening intervention level to 2.4m AHD. Unauthorised opening of the lake during July 2007 at 2.2m AHD and at a location south of the rock shelf resulted in a reduced scour of a deep channel and the rapid closure of the lake |
|
Natural Resources and Floodplain Management Committee: |
Yes |
|
Committee meetings held: |
Biannually |
Surface Water Quality Swan Lake and Berrara Creek
Home | Water | Coast and Estuaries | Swan Lake and Berrara Ck | 2007