Indicator description

Floodplain Management Plans

Council is committed to sound Floodplain Management in accordance with the process outlined in the NSW Government’s 2005 Floodplain Development Manual (see Figure 1). To achieve this goal, catchment specific Natural Resources and Floodplain Management Committees as well as a technical Flood Steering Group meet on a regular basis in order to assist Council in the development and implementation of Floodplain Management Plans for catchments within the City’s boundaries.

Figure 1: Floodplain Management Process as set out in 2005 NSW Floodplain Development Manual.

A detailed study, undertaken by SMEC Australia in 2001, identified that the following locations are in need of Floodplain Risk Management Plans (priority in brackets):

  • Lake Conjola / Berringer Lake (Lake Conjola) (high)
  • Woollamia / Myola (Currambene Creek) (high)
  • Berry (Broughton Creek) (high)
  • Burrill Lake (Burrill Lake) (high)
  • Kangaroo Valley (Kangaroo River) (high)
  • Huskisson / Vincentia (Moona Moona Creek) (high)
  • Tabourie Lake (Lake Tabourie) (high)
  • Callala Beach / Callala Bay (Callala Creek) (medium)
  • Culburra Beach (Lake Wollumboola) (medium)
  • Ulladulla (Millards Creek) (medium)
  • Tomerong (Tomerong Creek) (medium)
  • Bawley Point  (Willinga Lake) (low)
  • Currarong (Currarong Creek) (low)
  • Berrara / Cudmirrah (Swan Lake) (low)

In addition to these identified locations, Floodplain Management Studies and Plans are currently being prepared for Nowra Creek, the Lower Shoalhaven and St Georges Basin. (See figures 2 and 3 for catchment plan and status of Flood Program in these areas.)

              

Figure 2: Flood Studies                                                                             Figure 3: Floodplain Risk Management Studies & Plans

All of the above mentioned high priority catchment studies are now in progress and the status of these projects can be viewed in the following tables:

Catchment Name:

Lower Shoalhaven

Flood Study

Completed in 1990

Floodplain Risk Management Study

Final draft completed

Floodplain Risk Management Plan

Final draft completed

 

Catchment Name:

St Georges Basin

Flood Study

Completed in 2001

Floodplain Risk Management Study

Final draft completed

Floodplain Risk Management Plan

Final draft completed

 

Catchment Name:

South Nowra (Nowra Creek)

Flood Study

Completed in 2005

Floodplain Risk Management Study

Proposed for 2007

Floodplain Risk Management Plan

Proposed for 2009

 

Catchment Name:

Lake Conjola / Berringer Lake

Flood Study

Final Draft completed

Floodplain Risk Management Study

Proposed for 2007

Floodplain Risk Management Plan

Proposed for 2009

 

Catchment Name:

Woollamia / Myola (Currambene Creek)

Flood Study

Final Draft under review

Floodplain Risk Management Study

Proposed for 2007

Floodplain Risk Management Plan

Proposed for 2009

 

Catchment Name:

Berry (Broughton Creek)

Flood Study

Final Draft under review

Floodplain Risk Management Study

Proposed for 2007

Floodplain Risk Management Plan

Proposed for 2009

 

Catchment Name:

Burrill Lake

Flood Study

Final Draft under review

Floodplain Risk Management Study

Proposed for 2007

Floodplain Risk Management Plan

Proposed for 2009

 

Catchment Name:

Kangaroo Valley (Kangaroo River)

Flood Study

Final Draft under review

Floodplain Risk Management Study

Proposed for 2007

Floodplain Risk Management Plan

Proposed for 2009

 

Catchment Name:

Huskisson / Vincentia (Moona Moona Creek)

Flood Study

Final Draft under review

Floodplain Risk Management Study

Proposed for 2007

Floodplain Risk Management Plan

Proposed for 2009

 

Catchment Name:

Tabourie Lake

Flood Study

Study brief complete for tender

Floodplain Risk Management Study

Proposed for 2009

Floodplain Risk Management Plan

Proposed for 2011

 

Catchment Name:

Bomaderry Creek

Flood Study

Study brief complete for tender

Floodplain Risk Management Study

Proposed for 2009

Floodplain Risk Management Plan

Proposed for 2011

 TOP

Public Awareness

Raising public awareness of flood risk plays an important role in Floodplain Management.

Via the Floodplain Management Program, Shoalhaven City Council is progressively replacing historical flood information with data from detailed flood studies. The Public is encouraged to be actively involved in the process by contributing their own historical flood knowledge by either filling in questionnaires or attending public workshops for specific flood studies.

Public awareness of flood issues will also be broadened by disseminating information to the community via representatives of community groups who will be invited to attend a wide range of Natural Resources and Floodplain Management Committees. This will enable members of the public to contribute valuable information into the Floodplain Management Process via their elected representative as well as gain new knowledge from the representative’s reports back to their community groups.

Flood Information - General

Shoalhaven City Council in conjunction with SES produced four site specific flood brochures for Shoalhaven Heads, Nowra/Bomaderry/Terara, Greenwell Point/Orient Point and Sussex Inlet.

General Flood Information booklets, such as “What to do before, during & after a flood” prepared by Emergency Management Australia are also available.

Don’t drive through Flood Waters! Wait and be safe!

You can pick up free copies of all brochures at the City Administration Building in Nowra.

Flood Information – Specific

In addition to flood brochures, Council developed an electronic Flood Level Enquiry System for flood level, hazard and hydraulic category data for specific properties. Requests can be lodged in person at Council or on the Council Internet site (please note that a fee will be charged for this service as per Council’s fees and charges schedule):

http://www.shoalhaven.nsw.gov.au/

·            Click on “Enquiry Counter”

·            Go to “online applications”

·            Go to “Flood Information Request”, fill in the request form and press “send"

TOP

Flood Development Control Plan – DCP 106

DCP No. 106 – Floodplain Management provides information and development controls needed to prepare and assess development applications on flood prone land and applies to all development or works on flood prone land.

The DCP will assist in the management of individual development applications on flood prone land, where a Floodplain Risk Management Plan has been prepared. At present the two areas for which a management plans exist are Terara Village and the Riverview Road area. Further management plans are currently being prepared for St Georges Basin and the Lower Shoalhaven River areas. It is intended that as the various Floodplain Risk Management Plans are prepared the relevant provisions will be incorporated into DCP No. 106.

The DCP has been developed as a "plain English document" which is performance based, and utilises objectives, performance criteria and acceptable solutions to guide development within the floodplain. The provisions of the NSW Floodplain Management Manual (2005) and other relevant legislation have also been incorporated into the document. Generic flooding information, controls and terms have been added to assist in creating a document which provides all relevant flooding information to assist the users of the document. 

The DCP provides Council with an essential tool for managing risk and liability associated with development within the floodplain. The DCP also provides a level of certainty in regard to the type of measures which need to be taken to minimize the risk associated with development within the floodplain. The document has been based upon extensive risk management studies and the guidelines contained within the document follow State government guides and recommendations.

Flood Policy

In catchment areas where a Floodplain Risk Management Plan has not been completed, general controls as outlined in Council’s Flood Policy will apply. Some of these areas in time will be covered by Floodplain Risk Management Plans however a significant number of catchments within the Shoalhaven area are too small or considered to be low risk and will remain under the control of the Flood Policy.