|
|
|||||||||||||||||||||||||||||
| Estuary Name: |
LAKE CONJOLA |
| Status of plan: | Plan adopted (September 1998) |
| Actions undertaken: |
Entrance Management Policy completed. 2002 Entrance spit dune stabilisation : first stage completed to repair damage from lake opening 2001 Second stage commenced 2005 and was destroyed in April 2006 by a coastal storm Stormwater audit and remediation program completed Caulerpa mapping completed 2002 with wash down bays installed 2001 Crown Lands Assessment for the southern shore reserves scheduled for 2003-2004. Foreshore rehabilitation plan to follow from assessment. Funding for education campaign and foreshore rehabilitation works included in the 3 year Estuary Program submission 2006 |
| -Nature Conservation |
Entrance management actions and any proposed interventions take account of shorebird breeding seasons. |
| -Water Quality |
Construction of reticulated sewerage scheme commenced 2006. Septic system audit completed 2002 to address non functional systems. |
| -Erosion and Sedimentation |
Stormwater and road sedimentation audit completed 2002 with implementation of mitigation measures completed 2003 with outstanding works included in the Drainage Program. |
| -Cultural Heritage |
|
| -Flooding |
Flood Study draft completed 2006. Information combines catchment and oceanic flood impacts and provides information to minimise risk to life and property by setting floor levels for development and informing the SES of potential flood extent and hazards. Floodplain Risk Management Study and Management Plan scheduled 2007-08
|
| -Fishery |
Fishing Haven Status 2002 Interim strategy adopted and implemented for the management of the invasive aquatic weed Caulerpa Taxifolia. Boating plan of management review undertaken by NSW Maritime with assistance of the Southern Shoalhaven Natural Resources and Floodplain Management Committee. The review considered Caulerpa taxifolia. |
| -Recreation, Waterway Access & Boating |
Regional boat ramp proposed for Killarney St. Detailed design proposed for 2003 has been postponed due to increasing Caulerpa populations and the risk of spread to other estuaries. Facility upgrade at the entrance boat ramp including a four table picnic shelter and double electric BBQ completed in 2003. Access road and carpark at Cunjurong Point boat ramp upgrade completed in 2003. Foreshore rehabilitation projects for Cunjurong Point and Conjola Entrance boat ramp reserves to be completed in 2006. ($50,000 each) Boating plan of management review undertaken by NSW Maritime with assistance of the Southern Shoalhaven Natural Resources and Floodplain Management Committee. To be finalised late 2006. |
| -Visual Quality |
Very Good |
| -Estuary Entrance |
The 2006 Easter coastal storm displaced large quantities of sand into the entrance channel and the electronic monitoring shows closure is progressing and is expected during 2006-2007. Entrance management plan activated with preparatory entrance survey underway to estimate intervention costs should entrance closure occur. |
| Task Force: | Southern Natural Resource and Floodplain Management Committee |
| Task Force meetings held : |
Biannually with additional meetings of an a needs basis. |
Surface Water Quality Lake Conjola
Home | Water | Coast and Estuaries | Lake Conjola | 2006